2003-2007 SBW has completed various civil projects for Chevron Refinery, including the Low Sulfer Gas Plant Concrete package, which featured a single 700 cubic meter pour (2003). Also included a Water Cooling Facility (2006), Lower Tank Row (2005), and Tank 177 Foundation (2007).